Arvind Envisol Limited ., In re
Date: March 25, 2021
Subject Matter
Service of supply, erection, commissioning and installation of waste-water pretreatment plant followed by operation and maintenance of such plant attracts 12% GST
Summary
Q) Whether the service of supply, erection, commissioning and installation of waste-water pretreatment plant followed by operation and maintenance of such plant attracts rate 12% of GST in terms of Notification No.11/2017 Central Tax (rate) Dated: 28…
M/s. Arvind Envisol Limited (herein after referred as Applicant), Apartment No. D-902, NCC Meadows, Doddaballapur Road, S.N.Halli Post, Bengaluru-560064 having GSTIN number29AAGCA9687AlZD, filed an application for Advance Ruling under Section 97 of CGST Act,2017 read with Rule 104 of the KGST Rules, 2017 and Section 97 of the KGST Act, 2017 read with Rule 104 of KGST Rules 2017 in FORM GST ARA-01…