Dredging of Wular lake along with its feeder channels and the strengthening of embankments of the lake attracts 5% GST

Works ContractGovernment Entity

Summary

The Wular Conservation and Management Authority has awarded the applicant a contract for the dredging of Wular lake along with its feeder channels and the strengthening of embankments of the lake. The applicant seeks a ruling on whether Sl No. 3(vii)…

1. Admissibility of the application 1.1 The Wular Conservation and Management Authority (hereinafter the recipient) has awarded the applicant a contract for the dredging of Wular lake along with its feeder channels and the strengthening of embankments of the lake. The applicant seeks a ruling on whether Sl No. 3(vii) of Notification No 08/2017 – Integrated Tax (Rate) dated 28/06/2017 (herein…