Vikram Solar ., In re

Date: May 6, 2019

Court: Authority for Advance Ruling
Bench: Andhra Pradesh
Type: Advance Ruling
Judge(s)/Member(s): S. Narasimha Reddy, D. Ramesh
Sign in to download the documents

Subject Matter

For establishment of solar power generating system, 70% of gross consideration shall be deemed to be supply of goods and the rest shall be considered as supply of services

Summary

1. Whether following three separate contracts awarded to a contractor for establishment of a Solar Power Plant namely: a) Contract for supply of Goods. b) Contract for supply of Erection and Installation Services c) Contract for supply of Operation a…

1. Brief Facts of the case: M/s Vikram Solar (hereinafter referred to as the Applicant) having its Office at 11/87/A, 4T, 1st floor, Madanapalle, Opposite Government Hospital, Andhra Pradesh, is a registered firm, under GSTIN 37AABCI5168D1ZN and engaged in manufacturing of high efficiency PV module and providing comprehensive EPC solutions. As part of setting up of solar power plants, the Applican…

Sign in to read the full case