Siemens Ltd ., In re

Date: August 19, 2019

Court: Authority for Advance Ruling
Bench: West Bengal
Type: Advance Ruling
Sign in to download the documents

Subject Matter

GST applicable on mobilisation advance

Time Of Supply

Summary

The Applicant has entered into a contractM/s Kolkata Metro Rail Corporation (hereinafter KMRCL) for ‘design, supply, installation, testing and commissioning’ of the power supply and distribution system, third rail system and SCADA system…

1.1 The Applicant has entered into a contract (hereinafter the Contract) with M/s Kolkata Metro Rail Corporation (hereinafter KMRCL) for ‘design, supply, installation, testing and commissioning’ of the power supply and distribution system, third rail system and SCADA system for the entire line and depot of the Kolkata East-West Metro Rail Project. It includes the supply of equipment, t…

Sign in to read the full case

Create a free account or sign in to access the complete content.