Fermi Solar Farms (P.) Ltd., In Re

Date: March 3, 2018

Court: Authority for Advance Ruling
Bench: Maharashtra
Type: Advance Ruling
Judge(s)/Member(s): B.V. BORHADE AND PANKAJ KUMAR
Sign in to download the documents

Subject Matter

Solar power plant contract agreements would be treated as "works contract"

Works Contract

Summary

M/s. Fermi Solar Farms Private Ltd. is engaged in operation of renewable energy power plant projects. These typically include operation of solar power plants set up across India for generation and distribution of electricity generated. They sought an…

Handing over of entirely completed 60 MW-AC solar power project as per agreed scope Arranging the land for the complete project, free from all encumbrances shall be the scope of Owner All the major equipments/materials/items shall be procured by Owner and will be handed over to Contractor for erection and commissioning works. However, all the construction material shall be in scope of Contractor T…

Sign in to read the full case

Create a free account or sign in to access the complete content.